We are an integrated (i) construction and (ii) infrastructure development and management company in India, having successfully implemented a diverse portfolio of projects with a strategic capability to develop environmentally sustainable projects. Since commencing our business in 1994, we have constructed and developed projects servicing various industry sectors, such as water and waste water, transportation, irrigation, industrial parks (including SEZs), power transmission and distribution, residential, commercial and retail property developments and a transport terminal development. We are headquartered in Hyderabad, Andhra Pradesh, and have [five zonal offices and three regional offices] to manage our business operations throughout India and an overseas office at Sharjah, UAE. Our pan-India presence has allowed us to service the growing infrastructure needs throughout the country.
Our Company is the flagship company of the Ramky Group, a group of affiliated companies that provide services in relation to waste management, environmental consulting, finance and accounting, data management, indirect procurement, real estate development, pharmaceuticals and emerging technologies.
We operate in two principal business segments (i) a construction business which is operated by our Company, and (ii) a developer business which is operated through [11] Subsidiaries and Associates. A majority of our development projects are public private partnerships and are operated by separate special purpose vehicles promoted by our Company and the Government. Our wholly owned subsidiary in the United Arab Emirates, Ramky Engineering and Consulting Services FZC, operates a [small] consultancy business.
Our work force, as at June 30, 2009, consisted of [1448] full-time employees on a consolidated basis. We own a large fleet of sophisticated construction equipment, including, crushing plants, hot mix plants, wet mix plants, asphalt batching plants, concrete batching plants, transit mixers, concrete pumps, reversible drum mixers, excavators, rock breakers, backhoe loaders, graders, pavers, compactors, tower cranes, mobile cranes, dozers, tough riders and bar bending & cutting machines. Our work force, machinery assets, financial net worth and past execution capabilities enable us to undertake many large-scale projects. |
| |
|
|
| |
|
|
| |
:: The Company (Construction Business)
The Company, which operates in the construction business, undertakes projects in the following sectors:
- Water and waste water projects such as water treatment plants, water transmission and distribution systems, elevated reservoirs and ground level service reservoirs, sewage treatment plants, common effluent treatment plants, tertiary treatment plants, underground drainage systems and lake restorations (the "Water and Waste Water" sector);
- Irrigation projects such as cross-drainage works, lift irrigation projects, dams and barrages (the "Irrigation" sector);
- Industrial construction projects such as industrial parks, [SEZs] and related works (the "Industrial" sector);
- Transportation projects such as expressways, highways, bridges, flyovers and dedicated service corridors (the "Transportation" sector);
- Building construction, which includes commercial, residential, public, institutional and corporate buildings, mass housing projects and related infrastructure and facilities such as hospitals and shopping malls (the "Building Construction" sector); and
- Power transmission and distribution projects such as electricity transmission networks, substation feeder lines and low tension distribution lines (the "Power Transmission and Distribution" sector).
|
|
| |
Our construction business is operated by the Company and consists of infrastructure and civil construction services. We executed our first infrastructure project in 1994. In recent years India has witness tremendous growth in infrastructure development. Increased investment in infrastructure has led to a surge in the activities at the construction industry. We believe that construction and infrastructure projects will continue to be a significant business driver for us. We have developed skill sets in providing engineering and construction services for a diverse range of industry sectors, such as Water and Waste Water, Irrigation, Transportation, and Power Transmission and Distribution. We also provide engineering and construction services for industrial projects and buildings.
The table below provides a breakdown by sector of the number of projects that our construction business has completed from April 1, 2002 to June 30, 2009 and the [aggregate value of these completed projects].
|
|
| |
|
Number of Completed Projects
|
Value of Completed Projects in Rs. Million
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Completed Projects – Water and Waste Water |
|
| |
|
|
| |
Between April 1, 2002 and June 30, 2009, we successfully completed [103] Water and Waste Water projects, including water treatment plants, water transmission and distribution systems, elevated reservoirs and ground level service reservoirs, sewage treatment plants, common effluent treatment plants, tertiary treatment plants, underground drainages and lake restorations. The table below provides the details of five key Water and Waste Water projects that we completed between April 1, 2002 and June 30, 2009. |
|
| |
|
|
| |
|
|
Value of Completed Project in Rs. Million
|
|
Bhanasimal Regional Water Supply Scheme at Bhanasimal, Gujarat |
Gujarat Water Supply and Sewerage Board |
489.06 |
May 31, 2006 |
100 MLD Sewage Treatment Plant at Jalandhar |
Punjab Water Supply and Sewerage Board |
240.65 |
September 13, 2008 |
Bangalore Water Supply & UGD Facility |
Bangalore Water Supply and Sewerage Board |
169.50 |
March 19, 2006 |
Construction of main UGD for BTDA at Bagalkot |
BTDA |
125.66 |
March 01, 2003 |
Abatement of Pollution at River Moosi |
Hyderabad Metropolitan Water Supplu and Sewerage Board |
101.13 |
September 30, 2006 |
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Completed Projects – Building Construction |
|
| |
|
|
| |
Between April 1, 2002 and June 30, 2009, we successfully completed [81] Building Construction projects, which includes structures such as commercial, residential, public, institutional and corporate buildings, mass housing projects and related infrastructure and facilities such as hospitals and shopping malls. The table below provides the details of five major Building Construction projects that we completed between April 1, 2002 and June 30, 2009. |
|
| |
|
|
| |
|
|
Value of Completed Project in Rs. Million
|
|
Construction of 1190 Miners Quarters at Ramagundam |
The Singareni Colleries Company Limited |
491.79 |
September 30, 2007 |
Shriram Properties Private Limited |
Shriram Properties Private Limited |
320.00 |
October 30, 2006 |
Const of Garment Park - Phase- 1 |
West Bengal Infrastructure Development Corporation |
307.38 |
August 19, 2008 |
Married Accommodation Project, Vimanpura, South
|
Director General, Married Accomadation Project, New Delhi |
275.06 |
June 30, 2008 |
750-bed hospital building and ancillary structures at Cuddapah, Andhra Pradesh |
Andhra Pradesh Health & Medical Housing & Infrastructure Development Corporation |
361.77 |
October 31, 2006 |
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Completed Projects – Irrigation |
|
| |
|
|
| |
Between April 1, 2002 and June 30, 2009, we successfully completed [15] Irrigation projects, including cross drainage works, lift irrigation projects, dams and barrages. The table below provides the details of five key irrigation projects that we completed between April 1, 2002 and June 30, 2009. |
|
| |
|
|
| |
|
|
Value of Completed Project in Rs. Million
|
|
Upper Thunga Project – Package IV (Irrigation Canals - Km 13-14) at Shimoga, Karnataka |
Karnataka Neeravari Nigam Limited |
|
December 31, 2005 |
Construction of branch canal works at Nandyal |
Sri Ramsagar Branch Canal Scheme, Nandyal |
123.97 |
October 31, 2004 |
Construction of a pipeline and aqueduct on the Bansagar Canal at Mirjapur |
UP Irrigation Department, Mirjapur |
91.31 |
October 31, 2008 |
Puttur Barrage Work |
Karnataka Urban Infrastructure Development & Finance Corporation [KUIFDCL,] Mangalore |
85.90 |
March 31, 2008 |
| Upper Thunga Project – (Irrigation Canals - Km 148-150) at Rattihalli, Karnataka |
Karnataka Neeravari Nigam Limited |
52.06 |
September 30, 2004 |
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Completed Projects – Industrial |
|
| |
|
|
| |
Between April 1, 2002 and June 30, 2007, we successfully completed [31] Industrial projects such as parks and related services such as waste management for pharmaceutical, aluminum and textile industry clients. The table below provides the details of two major industrial project that we completed between April 1, 2002 and June 30, 2009. |
|
| |
|
|
| |
|
|
Value of Completed Project in Rs. Million
|
|
Civil structures for Cytotoxic Facility formulation Unit-7 at Visakhapatnam, Andhra Pradesh |
Dr. Reddy’s Laboratories Limited |
42.45 |
November 30, 2006 |
| Installation of lifts at Aranya Bhavan |
Andhra Pradesh Industrial Infrastructure Corporation Limited, Hyderabad |
55.70 |
March 11, 2007 |
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Completed Projects – Transportation |
|
| |
|
|
| |
Between April 1, 2002 and June 30, 2009, we successfully completed [27] Transportation projects, including expressways, highways, bridges, flyovers, and dedicated service corridors. The table below provides the details of six key Transportation project that we completed between April 1, 2002 and June 30, 2009. |
|
| |
|
|
| |
|
|
Value of Completed Project in Rs. Million
|
|
Project Road No. 14, SH -11 Satna - Amarpatnam -30.2 KM and Project Road No. 13, SH -9 Rewa - Semaria -26 KM |
Madhya Pradesh Road Development Corporation Limited |
476.48 |
October 12, 2008 |
| Street development at Ahmedabad |
Ahmedabad Municipal Corporation |
153.40 |
September 30, 2007 |
| Four lane link road connecting Old Mahabalipuram |
IT Expressway Limited |
73.76 |
May 31, 2008 |
| Bhaktipath Road Project |
Ahmedabad Municipal Corporation |
73.07 |
September 30, 2007 |
| Construction of roads - Pkg WRP - 4, Warangal |
Superintendent Engineer, Panchayat Raj Circle, Warangal, A.P |
47.93 |
July 31, 2004 |
| Laying of Internal Roads at Ramagundam |
The Singareni Colleries Company Limited |
42.97 |
January 06, 2007 |
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
:: Developer Business |
|
| |
|
|
| |
Our developer business began in Fiscal 2007 and is an extension of our operations and competencies in the civil and infrastructure construction businesses. Development projects are usually undertaken on a public private partnership basis with the Government [and are awarded only after qualifying through a competitive bidding process].
Each of the entities that comprise our developer business is a special purpose vehicle formed for the development of a project and [jointly controlled] by the Government and us. The table below gives summary details of each of our subsidiaries and Associates that comprise our developer business. |
|
| |
|
|
| |
|
Name of the Subsidiary or Associate |
Company’s Beneficial Ownership
(%) |
Project and Location |
Estimated Project Cost in Rs. Million |
Completion Date/
Scheduled Completion Date |
|
Jawaharlal Nehru Pharma City (India) Limited |
51 |
Jawaharlal Nehru Pharma City, an Industrial Park at Parawada Visakhapatnam, Andhra Pradesh |
5420.65 |
September 2010 |
|
MDDA Ramky IS Bus Terminal Limited |
100 |
Inter State Bus Terminal at Dehradun, Uttarakhand (Phase 1) Commercial mall located next to the Inter State Bus Terminal at Dehradun, Uttarakhand (Phase 2) |
131.00
(Phase 1)
319.04
(Phase 2) |
June 2004
(Phase 1)
March 2010 (Phase 2) |
|
Gwalior Bypass Project Limited |
51 |
Gwalior Bypass Project at Gwalior, Madhya Pradesh |
3,321.12 |
September 2010 |
|
Ramky Towers Limited |
51 |
Commercial and residential buildings at Gachibowli, Hyderabad, Andhra Pradesh |
4000.29 |
March 2011 |
|
Ramky Elsamex Hyderabad Ring Road Limited |
74 |
Outer ring road to Hyderabad City |
3,993.70 |
November 2009 |
|
Ramky Herbal and Medicinal Park (Chhattisgarh) Limited |
100(1) |
Herbal and medicinal industrial park in the district of Dhamtari, Chhattisgarh |
964.43 |
October 2014 |
|
Ramky Food Park (Chhattisgarh) Limited |
100(2) |
Food processing industrial park in the district of Rajnandagao, Chhattisgarh |
834.84 |
October 2014
|
| Naya Raipur Gems and Jewellery SEZ Limited |
100(3) |
Gems and jewellery industrial park in the district of Raipur, Chhattisgarh |
1,834.00 |
October 2014 |
| Ramky Enclave Limited |
89.01 |
Integrated housing project Warangal |
2,163.70 |
September 2011 |
| Ramky Integrated Township Limited |
29.19(4) |
Integrated housing project |
34,244.20 |
72 months from satisfaction of the agreed conditions precedent |
| Ramky MIDC Agro Processing Park Limited |
100(5) |
Agricultural-processing industrial park at Latur, Maharashtra |
467.57 |
August 2013 |
|
|
|
| |
|
|
| |
| (1) |
Our Company will have an 89% interest in Ramky Herbal and Medicinal Park (Chhattisgarh) Limited after having successfully completed the project. After financial closure and not after final completion. To check? |
| (2) |
Our Company will have an 89% interest in Ramky Food Park (Chhattisgarh) Limited after having successfully completed the project. |
| (3) |
Our Company will have a 26% interest in Naya Raipur Gems and Jewellery SEZ Limited after having successfully completed the project. |
| (4) |
Our Company will have a 26% interest in Ramky Integrated Township Limited after having successfully completed the project. |
| (5) |
The Company will have a 74% interest in Ramky MIDC Agro Processing Park Limited after having successfully completed the project. |
|
|
| |
|
|
| |
|
|
| |
Ramky Pharma City (India) Limited |
|
| |
Ramky Pharma City (India) Limited, in which the company has a 50.72% beneficial interest, is currently developing the Jawaharlal Nehru Pharma City Industrial Park at Parawada, Visakhapatnam. This is an integrated industrial park aimed at bulk drug manufacturers, pharmaceutical companies and fine chemical manufacturers. When complete, the industrial park will be 2,120 acres, of which 611 acres has been notified as a sector specific SEZ industrial park. When complete, the industrial park will have a saleable/leaseable area of approximately 1,427 acres. The total project cost is expected to be Rs. 4,009.58 million. The project is being developed on a BOO basis.
The features of the industrial park will include power, water, a road network with street lighting, a common effluent treatment plant, a hazardous waste management facility, a marine outfall for the disposal of treated effluents, a dedicated telephone exchange with internet connectivity, a central fire protection service, a logistics hub, container terminals and a common warehouse facility. The amenities will include banking facilities, a primary health centre, food courts and a club house. Regulatory approvals for businesses operating at the park are at the park level under a single window clearance concept. The construction of the industrial park is due to be completed by the end of 2009. |
|
| |
|
|
| |
MDDA Ramky Inter State Bus Terminal Limited |
|
| |
MDDA Ramky Inter State Bus Terminal Limited, which is 100% owned by the company, operates the Inter State Bus Terminal, Dehradun. This bus terminal is one of the first interstate bus terminals to be built on a BOT basis in India. The bus terminal was built by the company and the construction was completed in June 2004. The cost of construction was approximately Rs. 131 million. The bus terminal comprises 49 bus passenger drop off and loading bays, 54 shops, which are leased, parking for approximately 225 cars and a 10-bed dormitory. MDDA Ramky Inter State Bus Terminal Limited earns revenue from bus terminal fees, rental fees from shops, vehicle parking fees, fees from advertisements on hoardings and wall space, accommodation charges from the dormitory located at the bus terminal, and operation and maintenance fees.
MDDA Ramky Inter State Bus Terminal Limited, in the second phase of the project, is developing a 110,000 square feet commercial mall. The mall will include shops, a three-screen multiplex, three food courts and parking bays. The cost of the mall is expected to be Rs. 152.40 million and it is expected to be completed before the end of March 2008. The contracts for the construction of the mall were awarded to various companies. MDDA Ramky Inter State Bus Terminal Limited will earn revenue from the mall from upfront lease payments, parking fees, fees from advertisements on hoardings and wall space and operation and maintenance charges. |
|
| |
|
|
| |
Gwalior Bypass Project Limited |
|
| |
Gwalior Bypass Project Limited, in which the company has a 51% interest, is developing a 42 km road that will connect NH-3 & NH-75 in Madhya Pradesh. The road is being built on a BOT basis, with semi-annuity payments. Construction of the road is expected to cost Rs. 3,321.12 million. The construction of the road began in April 2007 and is expected to be completed by October 2009. |
|
| |
|
|
| |
Ramky Towers Limited |
|
| |
Ramky Towers Limited, in which the Company has a 51% interest, is developing an integrated residential and commercial project on 17.10 acres of land in Gachibowli, Hyderabad, Andhra Pradesh. The development will have a saleable area of 1,466,190 square feet. There will also be a 20,670 square feet club house, which will not be for sale. The estimated project cost is Rs. 2,667.37 million. Construction of the development began in April 2007 and it is scheduled to be completed by mid 2010. |
|
| |
|
|
| |
Ramky Hyderabad Ring Road Limited |
|
| |
Ramky Hyderabad Ring Road Limited, in which the company has a 74% interest, had entered into an agreement with the Hyderabad Urban Development Authority (“HUDA”)to design, develop, finance, operate and maintain a 12.63 km long, eight-lane access controlled expressway under a Phase –II A Program as an extension of Phase–I of the Outer Ring Road to Hyderabad. This project will provide easy connectivity to NH-7 and NH-9, which passes through Hyderabad. We are undertaking this project on a BOT basis with semi-annuity payments. The estimated project cost is Rs. 3,993.70 million. The construction of the road began in October 2007 and it is expected to be completed by April 2010. |
|
| |
|
|
| |
Ramky Enclave Limited |
|
| |
Ramky Enclave Limited in which the company has 89.01% interest, is developing an integrated housing project on 32 acres of land. It will have a saleable area of 1,058,254 square feet. There will also be a 20,000 square feet club house, which will not be for sale. The estimated project cost is Rs. 1,120.07 million. Construction of the housing project began in December 2007 and is expected to be completed by June 2010. |
|
| |
|
|
| |
Ramky Herbal and Medicinal Park (Chhattisgarh) Limited |
|
| |
Ramky Herbal and Medicinal Park (Chhattisgarh) Limited has been awarded the concession to develop a 250-acre herbal and medicinal industrial park in the district of Dhamtari, Chhattisgarh on a BOT basis. The concession period is 90 years. When complete, the project will have a leaseable area of 150.33 acres. The estimated project cost is Rs. 964.43 million. The construction of the project is expected to start in 2009 and be completed by October 2014. The company currently has 100% interest in Ramky Herbal and Medicinal Park (Chhattisgarh) Limited but will end up with 89% interest after financial closure of the project. The other 11% interest will be owned by Chhattisgarh Infrastructure Development Corporation Limited (“CIDC”), an entity owned by the Government of Chhattisgarh. |
|
| |
|
|
| |
Ramky Food Park (Chhattisgarh) Limited |
|
| |
Ramky Food Park (Chhattisgarh) Limited has been awarded the concession to develop a 303-acre food processing industrial park in the district of Rajnandagao, Chhattisgarh on a BOT basis. The concession period is 90 years. It will have a leaseable area of 195.15 acres. The estimated project cost is Rs. 834.84 million. The construction of the project is expected to begin in 2009 and be completed by October 2014. The Company currently has 100% interest in Ramky Food Park (Chhattisgarh) Limited. However, after financial closure of the project, the Company will have 89% interest and CIDC will have 11% interest in Ramky Food Park (Chhattisgarh) Limited. |
|
| |
|
|
| |
Ramky Gems & Jewellery Park (Chhattisgarh) Limited |
|
| |
Ramky Gems & Jewellery Park (Chhattisgarh) Limited has been awarded the concession to develop a 70-acre gem and jewellery SEZ in the district of Raipur, Chhattisgarh on a BOT basis. The concession period is 90 years. When complete, it will have a leaseable area of 42.03 acres. The estimated cost of the project is Rs. 1,834 million. The construction of the project is expected to begin in 2009 and be completed by October 2014. The Company currently has 100% interest in Ramky Gems & Jewellery Park (Chhattisgarh) Limited. However, after financial closure of the project, the company will have 26% interest, CSDIC 11% interest, Aetens Goldsouk International Ltd 21% interest, P.D. Gupta Infratech Private Limited 21% interest and Chhattisgarh Futuristic Infrastructure Private Ltd 21% interest in Ramky Gems & Jewellery Park (Chhattisgarh) Limited. |
|
| |
|
|
| |
Ramky Integrated Township Limited |
|
| |
Ramky Integrated Township Limited, in which the company has a 30.60% interest, is developing an integrated township project called Discovery City on 400 acres of land in Srinagar Village, Maheshwaram Mandal, R. R. District, Andhra Pradesh on a BOO basis. The proposed project will have 45% residential developments, 5% social developments (police stations, fire stations, etc.) and will include commercial and industrial developments. 5% of the developed area of the project is to be set aside for the weaker classes. The development will have a saleable area of approximately 16 million square feet. The preliminary estimated project cost is Rs. 19,492 million. A more detailed estimate of the project cost will be prepared after completion of the detailed project report which was scheduled to be completed by May 12, 2007. The construction of the project was expected to begin in October 2008.
The project was awarded by HUDA to our consortium, which comprises of the company (51% interest), Ramky Estates and Farms Private Limited (38% interest) and Mumbai Waste Management Limited (11% interest), both of which are Promoter Group companies, in a letter of award dated November 12, 2007. A shareholders agreement was among the consortium between Ramky Integrated Township Limited and the owners of the land on which the project is to be built. The letter of award requires the development agreement for the project to be executed among HUDA and the parties to the shareholders agreement within a period of 15 days from the date of the execution of the shareholders agreement. The letter of award sets forth a number of significant events of default that will enable HUDA to cancel the letter of award prior to the signing of the development agreement. |
|
| |
|
|
| |
|
|
| |
Pharmaceutical, Bio-technology and Chemical Park at Haldia, West Bengal |
|
| |
Haldia Development Authority (“HDA”) and the company have entered into a Memorandum of Understanding with respect to the company developing a 2,500 acre pharmaceutical, bio-technology and chemical park in Haldia, West Bengal. HDA has agreed to acquire this land on an urgent basis and sell it to the Company. HDA has agreed to make available a minimum of 650 acres for the park. The Company has agreed to pay the cost of the land plus 10%. It has also agreed to pay for any rehabilitation work on the land. The features of the park will substantially be the same as Pharma City. When complete, the park will have a leaseable area of approximately 1,500 acres. The preliminary estimated project cost for the entire 2,500 acre development is Rs. 9,500 million.
The Memorandum of Understanding provides that the company and HDA will incorporate a special purpose vehicle for the project in which the company will have 89% interest and HDA will have 11% but as of yet the special purpose vehicle has not been incorporated. |
|
| |
| |
|
|
| |
 |
|